Rapid budding technique of Lentinus edodes
During the cultivation of Lentinus edodes, budding will be carried out to improve the yield and quality, but if the mushroom does not produce for a long time after budding and miss the best cultivation season, the yield and quality will be affected. The following editor summarizes the budding techniques of Lentinus edodes. Let's take a look.
1. Directional piercing
Four iron nails with a length of 8-10 cm can be nailed on a 45 cm long and suitable width board to form a nail row, which can be pierced on each side of the stick, which will form eight conspicuous nails and make them produce mushrooms quickly.
2. Soak the bag regularly
Put the stick after the piercing into the barrel, in order to prevent it from floating, and then soak it with a low concentration of urea solution. The stick of the mushroom usually needs to be soaked for 1.5-2 hours, while the mushroom that has been produced twice is soaked for 2-3 hours each time. It is appropriate to soak the water content near the piercing hole at 65% Murray 75% and other parts at 45% Murray 60%. Generally, the weighing method is used to determine the amount of soaking water. After the first immersion, the cultivation of the bacterial stick is 100% of the quality, while the weight of the spring bag is 90%, and the amount of water should be reduced by about 15% after each immersion.
3. Temperature difference accelerates buds
Choose a sunny day when the temperature difference between day and night is 8-20 degrees Celsius, the temperature at night must be below 12 degrees, and the medium-temperature strain needs low temperature stimulation of 14-16 degrees. After immersing in water, pierce the hole at one end of the stick, face down, discharge it on the leeward and sunny, non-stagnant ground, then cover it with plastic film, place a thermometer, and do a good temperature test. Sunlight during the day, so that the film as high as 28-32 degrees, maintain 1-4 hours, then uncover the film, with low temperature at night to stimulate 4-6 hours.
4. Mushroom production management
Through piercing, soaking and temperature difference stimulation, the bacterial stick can be placed directly in place and covered with plastic film, and a large number of mushroom buds can be grown in about 2-3 days in the environment of 18-24 degrees. The bacterial stick with more buds can be put into the lower layer of the mushroom shed from the evening of the second day or early in the morning of the third day. From then on, every other half day to one day, put it into the mushroom shed from the bottom up, and all of it will be completed within 3 days.
The above is the introduction of rapid budding technology of Lentinus edodes. I hope it can help you. If you want to know more about it, please follow us.
- Prev
What are the key techniques for the cultivation of Pleurotus ostreatus? Management points of Pleurotus ostreatus in spring efficient cultivation techniques
Key points of management of Pleurotus ostreatus in spring
- Next
What kind of vegetables should be planted for a short period and a quick harvest?
For those who grow vegetables on the roof balcony, the most annoying thing is that there is not much place to grow more kinds of vegetables, but there are no vegetables to eat. So I summed up one.
Related
- Where is it suitable to grow horseradish in China? it is expected to see the middle altitude horseradish in Alishan.
- How to prevent tomato virus disease reasonably? (Control methods included)
- Many people like to plant towel gourd on the balcony. What are the main points of this method and management?
- What crops can chili peppers be mixed with?
- Fertilization techniques and matters needing attention in Tomato
- What are the grafting techniques for peach seedlings in spring?
- Harm and control methods of root swelling disease of Chinese cabbage
- What are the pests of sweet potatoes? How to prevent and cure it?
- Symptoms, causes and Control methods of navel Rot in Tomato
- The cause of "Cucumber rotten bibcock" in Farmers' planting Cucumber and its Control Plan