Soil Management of Jujube Orchard
Ploughing, weeding, loosening soil and preserving soil moisture: the newly planted jujube orchard made a 1m wide tree row after planting, and then widened year by year with the expansion of the tree crown. The pure jujube orchard with high density can generally be intercropped with some dwarf legumes or melons and vegetables three years before planting, and the jujube orchard with jujube grain intercropping can be used for long-term intercropping of crops. In this way, the scope of jujube soil management in the first three years is mainly in the range of tree rows, and the future soil management will be carried out in the whole garden. The primary problem in soil management is to eradicate weeds, because the growth of weeds absorbs a large amount of water and nutrients from the soil. Therefore, too many weeds will directly affect the growth potential of jujube. Another important link of soil management is to loosen soil in time, reduce water evaporation, improve soil permeability and so on. According to the Shanxi Fruit Tree Research Institute, the soil water content and nitrate nitrogen content of the clear jujube orchard were higher than those of the wasteland jujube orchard, the root length increased by 16.5%, the weight increased by 56.8%, and the fruit setting rate also increased.
It was also reported that when weeds were overgrown in the summer days, ploughing the soil three times and pressing weeds into green manure had a very significant effect. The length of jujube hanging increased by 50% compared with the control, the number of jujube strands increased by 20%, and the yield of jujube fruit increased by 35%.
- Prev
Skillfully storing peaches to prolong the fresh and crisp period
Timely pre-cooling and anti-softening due to the high temperature during harvest, especially the middle and late ripening varieties, if the peach is not precooled in time, the peach will soon soften and decay. Therefore, the peach should be precooled below 4 ℃ as soon as possible after harvest, generally using cold air cooling and water cooling. The water cooling rate is fast. The peach with a diameter of 7.6cm can be cooled in 1.6℃ water for 30 minutes, and its temperature can be reduced from 32 ℃ to 4 ℃. After water cooling, the peach can be dried and then packaged. The cooling rate of the wind is slow, which usually takes 8 to 12 hours or more. Storage
- Next
Ganli No.1
Ganli No. 1: tree posture upright, tree momentum moderate, annual branches dark red, dense, medium, not prominent, branch base easy light leg; dark green leaves, leaves very thick, small, long oval, leaf margin blunt, leaf tip gradually pointed, leaf surface slightly wavy. Fruit nearly round, peel yellow, white flesh, thin crisp, stone cells less juice, sweet and sour taste, quality. shoot germination rate is high (72.2%), shoot forming ability is medium (24.2%), shoot average length is 60.0 cm, shoot diameter is 0.780 cm, internode length is 2.9 cm,
Related
- Moge, come on! The staff of the peasant association in the producing area of cantaloupe were frightened when the crowd gathered.
- Causes and Solutions of low Fruit setting rate of Apple
- Symptoms and control measures of passion fruit virus disease
- Fruit growing lesson: how do apple orchards keep high yields?
- Can you build orchards in the mountains? What are the pros and cons?
- How to manage the coloring period of Crisson grape?
- This paper introduces the processing technology of two kinds of fig products.
- How much is a month for retired teachers in rural areas by 2020?
- How can strawberry planting increase sugar content? We should pay attention to management in many aspects.
- What are the cultivation techniques on how to improve the yield of golden fruit?