MySheen

100 head scale fattening cattle farm needs road wall hydropower machinery scale

Published: 2024-12-22 Author: mysheen
Last Updated: 2024/12/22, 100 head scale fattening cattle farm needs road wall hydropower machinery scale

The wall of the fattening cattle farm is 160 to 180 meters long, the road outside the barn is 1.2 meters wide and 110 to 130 meters long, and the road in the field area is 120 to 160 square meters. Hydropower facilities include poles and wires from the power supply to various facilities in the field, 40 to 50 square meters of storage tanks, pump wells, and so on. Machinery category includes 1 feed grinder, 1 feed mixer, 2 5-ton green straw cutters per hour, and all kinds of transport machinery. In addition, according to the acquisition of feed, Niuyuan, etc., decide whether to engage in weighing, daily tools, loading and unloading facilities.

 
0