In the process of raising sows, because sows running about or other reasons may lead to miscarriage or other things, pig farmers are always worried about this situation, so they have developed a sow positioning bar, which can not only effectively protect pregnant sows, but also facilitate the feeding and management of farmers.

Installation method of sow positioning bar

① set the aisle distance, put the side feet on both ends of the unit, after pulling the positioning line, observe whether the distance between the two feet is equal, straight can not have a slope.

② places the other side feet in turn, the distance between the side feet is the width of the floor, and the distance between the side feet and the middle foot is the length of the floor.

Install the floor between the side foot and the middle foot of ③. Don't forget to tighten the screws.

④ now observes whether the left and right columns are secure and whether they are installed horizontally and vertically.

⑤ installs the front and back doors of the positioning bar.

Daily maintenance of sow positioning pen

① regularly checks the positioning bar for rust, if it is dealt with in time.

② regularly checks whether the screws and other parts are loose, and if they are loose, reinforce them in time.

③ regularly paints and maintains the welding joints.

After ④ pigs are out of the pen, the positioning bar should be disinfected as a whole before the entry of the next batch of pigs is allowed.

⑤ cleans and disinfects the whole set of equipment every time the pig comes out of the pen.

 