MySheen

The wife doesn't like the fact that her parents don't support it when she only spends 150000 on a bungalow.

Published: 2024-12-22 Author: mysheen
Last Updated: 2024/12/22, I have been abroad for many years. A few years ago, I just bought a house and settled down in the city. I wanted to save money to buy a second apartment. My parents called and said that my old house had collapsed a wall. Now I have to go back to my hometown in the countryside to build a house, and I don't plan to spend too much money on farming.

I have been on the road for many years. I just bought a house and settled down in the city a few years ago. I wanted to save money to buy a second house. My parents called and said that my old house had collapsed a wall, and now I had to go back to my hometown in the countryside to build a house. I didn't plan to spend too much money to build a house in the countryside. I only planned to spend about 200000 to build a bungalow for my parents. I didn't know my wife didn't like it, saying that there was no need to spend money to take my parents to live in the city and take care of their children. But the parents don't want to come, and the neighbors are all small houses on the second or third floor, and they only build a floor where the old couple feel ashamed, especially the stubborn father, who doesn't like to bow in front of others all his life.

The design drawings are bought with money on the Internet, and since we only intend to build one floor, we have to build them with some characteristics.

Graphic design drawing

Support the ground ring beam formwork on the cushion

Pouring ring beam, backfilling soil, is there a single narrow circle beam?

Only one floor is built, so the foundation is a little large, about 170 square meters. The contractor looking for does not pack 220 square meters of material, but he has to pack a meal and a pack of cigarettes every day.

The first floor is covered with double-layer two-way steel bars, and the plumber pre-buries the water and electricity pipeline. although only one floor is built, it is also cast-in-place floor in order not to leak. The professional cast-in-place construction team of the village, 170square floor cast-in-place labor cost 2000.

 
0